kVA Tools logokVATools.io ❯ Power Factor Desk


Power Factor Desk

Technical Documentation and Calculation Methodology

1. Introduction

The Power Factor Desk estimates the reactive compensation required to improve the power factor of three-phase inductive loads to a specified target. It applies the standard reactive power compensation formula on a per-load basis, rounding each result up to the nearest commercially available kVAR step. Economic outputs — demand charge savings, estimated loss reduction, reactive power cost estimate, and simple payback — are provided to support feasibility assessment.

The tool is intended for planning and early-stage engineering. Each load is analyzed independently; the calculator does not model load coincidence, system impedance, harmonic content, or resonance effects. Results should be reviewed by a qualified engineer before use in procurement or final design.

Important Limitations: This calculator is for planning purposes only. Harmonic derating, resonance analysis, switched bank design, self-excitation, and protection coordination are outside its scope. Consult IEEE Std 18 (Shunt Power Capacitors) and IEEE Std 1036 (Guide for Application of Shunt Power Capacitors) for final design.

2. Definitions

2.1 Power Triangle Quantities

Active Power (P)

Active power, measured in kilowatts (kW), is the real component of electrical power — the portion converted to useful work (mechanical output, heat, light). For a load with apparent power S and power factor PF:

P = S × PF

Reactive Power (Q)

Reactive power, measured in kilovolt-amperes reactive (kVAR), is the component that oscillates between source and load to sustain magnetic fields in motors, transformers, and other inductive equipment. It does no useful work but increases current in conductors and transformers, causing additional losses and reducing effective capacity. For a load with apparent power S and power factor angle φ:

Q = S × sin(φ) = S × √(1 − PF²)

Apparent Power (S)

Apparent power, measured in kilovolt-amperes (kVA), is the vector sum of active and reactive power. It determines the required rating of transformers, conductors, and switchgear:

S = √(P² + Q²)

Power Factor (PF)

Power factor is the ratio of active power to apparent power. It ranges from 0 to 1, with 1 indicating a purely resistive load. Inductive loads — motors, transformers, fluorescent lighting ballasts — draw lagging reactive current and have power factors below 1. A low power factor means a larger proportion of the current drawn is reactive, increasing conductor and transformer losses without contributing to useful output:

PF = P / S = cos(φ)

2.2 Power Factor Correction Principle

Shunt capacitors supply leading reactive current that cancels the lagging reactive current drawn by inductive loads. The net effect is a reduction in total reactive current flowing from the supply — reducing apparent power, increasing power factor, and lowering losses in upstream conductors and transformers. The compensation equipment does not reduce active power consumption; it redirects reactive current supply from the utility to a local source.

The reactive power that a shunt capacitor must supply to correct the power factor of a load from an existing angle φ₁ to a target angle φ₂ is:

Qc = P × (tan φ₁ − tan φ₂)

where tan φ = √(1 − PF²) / PF. This formula is the basis of all per-load calculations in this tool.

3. Input Fields and Parameters

3.1 System Parameters

Field Description
System Voltage, L-L (V) Nominal line-to-line voltage of the three-phase system. Used for reference and documentation only; it does not affect the kVAR calculation, which is derived from active and reactive power relationships alone.
Existing System Power Factor The overall power factor of the installation before correction. Used in the System Load Summary to display a reference aggregate power factor. Per-load calculations use the individual load PF values entered in the load table.
Target Power Factor Desired power factor after correction, typically 0.95 or above. All per-load Qc calculations use this value as φ₂. IEEE Std 141 recommends a target of at least 0.95 for industrial systems. A target at or above 0.98 triggers an over-correction warning; see Section 4.5.

3.2 Economic Inputs

Field Description
Demand Charge Rate ($/kVA/month) The utility's monthly demand charge per kVA of apparent power. Applied to the kVA reduction achieved by each bank to estimate annual demand charge savings. Enter zero if the tariff does not include a kVA-based demand component.
Energy Rate ($/kWh) The utility's energy tariff, used to compute the monetary value of estimated feeder loss reductions.
Annual Operating Hours (h/yr) Hours per year the installation operates. Used only in the energy savings estimate. Maximum value is 8,760 h/yr.
Billing Months per Year Number of months to which the demand charge applies. Installations that shut down seasonally may have fewer than 12 billing months.
Reactive Power Cost Installed unit cost of reactive power compensation, entered as a cost per kVAR or per VAR. The unit toggle ($/kVAR or $/VAR) converts VAR input to $/kVAR internally (×1000) before use. When entered, this value drives the reactive power cost estimate outputs in the Economic Analysis panel. Leave blank to suppress cost outputs.

3.3 Load Table

Field Description
Load / Area Name Descriptive label for the load or area. Used for identification only; has no effect on any calculated value.
Quantity Number of identical units of this load type, from 1 to 99. The quantity is applied as a multiplier to the resolved nameplate apparent power before duty cycle scaling, so the effective apparent power for the row is Qty × kVArated × (Duty% / 100). Use this field to represent banks of identical motors or equipment groups without entering duplicate rows.
Power Rating Nameplate rating of a single unit, entered as a numeric value paired with an inline unit selector. Five units are supported: W, kW and HP (active power), VA and kVA (apparent power). The selector defaults to W on first load, after Reset, and after New Project.

When an active-power unit (W or kW) is chosen, the entry is treated as the load's electrical active power and is converted to apparent power internally by dividing by the load's Power Factor: kVA = kW / PF. When HP is chosen, the value is treated as mechanical shaft power and first converted to electrical active power using the per-row Efficiency field (kWelec = HP × 0.7457 ÷ η), then divided by the Power Factor to obtain kVA. When an apparent-power unit (VA or kVA) is chosen, the entry is taken directly as the nameplate apparent power. In all cases the resolved kVA value feeds the quantity and duty cycle scaling described above, and drives the reactive power (kVAR) calculation used for compensation sizing. See Section 4.1 for the full conversion equations.
Power Factor Existing (uncorrected) power factor of the individual load, entered as a decimal between 0.10 and 1.00. This is the load's own power factor, not the system target.
Efficiency Full-load motor efficiency (ηmotor), entered as a decimal between 0.50 and 1.00. Used only when the Power Rating unit is HP, to convert mechanical shaft power on the nameplate to the electrical active power drawn from the supply (kWelec = HP × 0.7457 ÷ η). The field is greyed out and ignored for the W, kW, VA and kVA units — those are already electrical quantities at the supply terminals, so no efficiency adjustment applies.

The default value of 0.92 is representative of a medium-size (10–100 HP) three-phase induction motor at full load. For motors substantially smaller than 10 HP, premium- efficient or NEMA-rated high-efficiency motors, or VSD-driven motors operating well below nameplate, substitute the motor's stated efficiency from the nameplate or manufacturer data. If the efficiency is unknown and the HP unit is selected, the default 0.92 is retained; alternately, switch the unit to kW or kVA to enter the electrical quantity directly and bypass the efficiency step entirely.
Correction Location Planning label indicating the intended installation point of the compensation equipment: Motor Terminal, Motor Control Centre, Local Distribution Board, or Central Bus. Does not affect any calculated value, but is used to group loads for the Est. Cost by Correction Location output. See Section 4.4 for engineering considerations for each option.
kVAr (read-only) Per-unit nameplate reactive power for the row, computed from the resolved kVA rating and the Power Factor as kVAR = kVArated × √(1 − PF²). Shown for a single unit at 100% duty so the column serves as a sanity check on the Power Rating + unit-selector combination, independent of Qty and Duty (%). Quantity and duty scaling are applied only in the aggregate System Load Summary outputs.
kVA (read-only) Per-unit nameplate apparent power for the row after resolving the Power Rating entry through its unit selector. Equal to the entered value for VA/kVA units, and equal to kW / PF for W/kW units. Shown for a single unit at 100% duty, with the same semantics as the kVAr column above.
Duty (%) Percentage of time the load is energised, from 0 to 100. Applied as a linear scalar after quantity scaling to produce the effective apparent power used in calculations. See Section 4.3 for limitations.

The load table supports a minimum of 1 and a maximum of 10 load rows. Rows with a kVA rating of zero are excluded from all calculations.

4. Calculation Methodology

4.1 Power Rating Unit Conversion

The Power Rating field accepts five units. Active-power units (W, kW, HP) are converted first to electrical active power in kW, then divided by the load power factor to obtain apparent power (kVArated). Apparent-power units (VA, kVA) are taken directly as kVArated:

W → kWelec = Wentered / 1000
kW → kWelec = kWentered
HP → kWelec = HPentered × 0.7457 / ηmotor
VA → kVArated = VAentered / 1000
kVA → kVArated = kVAentered

For the three active-power units, the apparent-power conversion is then:

kVArated = kWelec / PF

The HP path applies the per-row Efficiency field (ηmotor) entered alongside the load, which defaults to 0.92. This default is representative of a medium-size three-phase induction motor at full load; for motors substantially smaller than 10 HP, premium-efficient or NEMA high-efficiency motors, or VSD-driven motors operating well below nameplate, the user should enter the motor's actual full-load efficiency. The Efficiency field is accepted between 0.50 and 1.00 and is ignored (greyed out in the UI) when the Power Rating unit is W, kW, VA or kVA — those units already describe electrical quantities at the supply terminals, so no efficiency adjustment applies. Alternatively, where the motor's efficiency is unknown, the user can enter the load directly in kW or kVA to bypass the HP conversion altogether.

The resolved kVArated is the value that feeds the per-load power component calculation in Section 4.2.

4.2 Per-Load Power Components

For each load row, the effective apparent power incorporates both the quantity of units and the duty cycle:

kVAeff = Qty × kVArated × (Duty% / 100)

Active and reactive power components are then derived from the effective apparent power and the load power factor:

P = kVAeff × PF
kVAR = kVAeff × √(1 − PF²)

All downstream calculations — Qc, standard kVAR rounding, corrected PF, and economic outputs — operate on these qty- and duty-scaled values. A single load row with Qty = 5 and kVArated = 100 kVA at 80% duty is therefore equivalent to five separate 100 kVA rows each at 80% duty.

4.3 Duty Cycle Treatment

Duty cycle is applied as a simple linear scalar: a 100 kVA motor at 75% duty is treated as a 75 kVA load throughout the calculation. This is a planning-level approximation that does not account for:

  • Load profile shape or inrush current during starting
  • Coincident demand from multiple loads operating simultaneously
  • Variation in reactive power draw across the duty cycle

For loads with highly variable duty cycles or significant starting inrush, results should be cross-checked against measured demand data before bank sizing is finalized.

4.4 Correction Location Considerations

The correction location field is a planning label only and does not alter any calculated value. The choice of installation point has significant engineering implications in practice:

Location Engineering Considerations
Motor Terminal Maximises feeder loss reduction — reactive current is eliminated at the source. Reduces current in the full circuit from the supply transformer to the motor terminals. Introduces self-excitation risk when the motor disconnects if the compensation rating exceeds the motor's no-load reactive current. Refer to IEEE Std 1036 Section 6 for maximum permissible capacitor ratings for individual motor correction.
Motor Control Centre Corrects reactive demand at the MCC busbar. Avoids self-excitation risk associated with terminal-connected compensation. Loss reduction applies only to the circuit upstream of the MCC; downstream cables and switchgear still carry uncorrected reactive current.
Local Distribution Board Corrects reactive demand for a group of loads served by the distribution board. A practical intermediate option between individual motor correction and centralised main bus correction.
Central Bus A single compensation unit at the main switchboard corrects the aggregate reactive demand of the installation. No reduction in losses on downstream feeders or distribution cables. Simplest installation and maintenance arrangement; most common approach for retrofitting existing installations.

4.5 Required Reactive Compensation (Qc)

The required reactive compensation for each load is calculated using the formula introduced in §2.2. The power factor angles are derived as follows:

  • tan φ₁ = √(1 − PFload²) / PFload — derived from the existing load power factor
  • tan φ₂ = √(1 − PFtarget²) / PFtarget — derived from the system target power factor

If Qc ≤ 0 (i.e. the load power factor already meets or exceeds the target), no correction is needed and Qc is set to zero.

4.6 Standard kVAR Rounding

The calculated Qc for each load is rounded up to the nearest commercially available standard kVAR size. The standard steps used by this calculator are:

2.5 | 5 | 7.5 | 10 | 12.5 | 15 | 20 | 25 | 30 | 40 | 50 | 60 | 75 | 100 | 125 | 150 | 200 kVAR

Because the rounded value is always ≥ Qc, the corrected power factor achieved is typically slightly better than the target value. If Qc exceeds 200 kVAR — the largest single standard step in the table — the calculator returns the exact calculated Qc value, indicating that multiple parallel units or a custom-rated bank would be required.

4.7 Corrected Power Factor

After applying the rounded Qc value, the residual reactive power and corrected power factor for each load are computed as:

kVARafter = max(kVARexisting − Qc,standard, 0)
kVAafter = √(P² + kVARafter²)
PFcorrected = P / kVAafter

The corrected power factor is colour-coded in the output: green for PF ≥ 0.95, amber for PF ≥ 0.85, and red for PF < 0.85.

4.8 Over-Correction Warning

A fixed compensation unit sized for a target power factor close to unity may produce a leading power factor when loads operate at partial capacity. Leading power factor can cause voltage rise at the point of connection, interfere with protection relay operation, and attract penalty charges from utilities that penalise leading as well as lagging power factors. The calculator flags a warning when the target power factor is set to 0.98 or above. For installations with variable loading, switched compensation equipment that disconnects reactive power steps at light load should be considered.

4.9 Economic Estimates

Annual savings are estimated at the system level as follows:

  • kVA reduction per load = kVAexisting − kVAafter
  • Annual demand charge savings = total kVA reduction × demand rate ($/kVA/month) × billing months/year
  • Loss reduction fraction per load = 1 − (PFload / PFcorrected)², applied to an assumed 3% baseline feeder loss
  • Estimated kW loss reduction = P × 0.03 × loss reduction fraction, summed across all loads
  • Annual energy savings = total kW loss reduction × operating hours/year × energy rate ($/kWh)

When a Reactive Power Cost ($/kVAR) is entered, the following additional estimates are produced:

  • Total est. reactive power cost = total rounded Qc (kVAR) × $/kVAR rate
  • Avg. cost per active load = total cost / number of active loads
  • Simple system payback = total reactive power cost / total annual savings
  • Est. cost by correction location = total standard kVAR at each location (summed across all rows, each already qty- and duty-scaled) × $/kVAR rate, shown only for locations with active loads
Economic Accuracy: The 3% baseline feeder loss assumption is a planning-level estimate. Actual feeder losses depend on conductor size, circuit length, load distribution, and installation configuration — typically ranging from 1% to 5% for industrial distribution systems. Demand charge savings are applicable only where the utility tariff includes a kVA-based demand component. Where demand is billed in kW (or kW with a power factor adjustment clause), the savings model does not apply directly and should be revised to match the actual tariff structure. The reactive power cost estimate uses the total standard kVAR installed across all loads and a single unit rate; it does not account for per-location price variation, installation labour, protection, or switching equipment.

5. Output Panels

5.1 Output — System Load Summary

Result Description
Total Active Power (kW) Sum of P across all active loads, accounting for duty cycle.
Total Reactive Power — existing (kVAR) Sum of kVAR across all loads before correction.
Total Apparent Power — existing (kVA) Vector magnitude: √(Ptotal² + kVARtotal²).
Computed System PF Aggregate power factor of the load profile before correction: Ptotal / kVAtotal.
Total kVAR Required Sum of individual Qc values (before rounding to standard steps).
System kVA After Correction Aggregate apparent power after all rounded Qc values are applied.
Corrected System PF System power factor after correction, colour-coded green ≥ 0.95, amber ≥ 0.85, red < 0.85.
Total kVA Demand Reduction Difference in aggregate apparent power before and after correction.

5.2 Output — Economic Analysis

Result Description
Annual Demand Charge Savings Aggregate demand savings across all loads, based on the system kVA reduction and the entered tariff rate.
Estimated kW Loss Reduction Total estimated active power saved through reduced feeder losses, summed across all loads.
Annual Energy Savings Monetary value of the loss reduction, based on operating hours and energy rate.
Total Estimated Annual Savings Sum of demand charge and energy savings. Intended as an order-of-magnitude figure for feasibility assessment.
Total Est. Reactive Power Cost Total installed cost estimate: total standard kVAR selected across all loads × the entered reactive power cost rate. Shown only when a rate is entered.
Avg. Cost per Active Load Total reactive power cost divided by the number of active loads (kVA > 0). Provides a quick per-load budget figure. Shown only when a rate is entered.
Simple System Payback Total reactive power cost divided by total estimated annual savings, in years. Shown only when a rate is entered and annual savings are non-zero.
Est. Cost by Correction Location Up to four rows — one per correction location type — each showing the estimated cost for all standard kVAR assigned to that location, with the kVAR quantity in brackets. Rows for locations with no active loads are hidden.

5.3 Output — Parameter Status

Check Description
Target PF Confirms whether the target PF meets the recommended minimum of 0.95. Displays a pass indicator for values ≥ 0.95 and a warning for values below.
Over-correction Risk Warns when target PF ≥ 0.98; fixed banks may produce leading power factor at partial load. See §4.8.
Loads Defined Reports the count of active load rows (kVA > 0).

6. Scope and Limitations

The following topics are explicitly outside the scope of this calculator. They must be addressed separately before proceeding to final design or procurement.

6.1 Harmonic Derating

Capacitor banks installed in systems with significant harmonic current content — from variable-speed drives, rectifiers, arc furnaces, or other non-linear loads — must be derated or fitted with detuning reactors (series inductors) to prevent overloading. Without derating, capacitors may carry currents well above their rated values at harmonic frequencies, leading to premature failure or fire risk. Refer to IEEE Std 18 for capacitor ratings under harmonic conditions, and to IEEE C57.110 for transformer derating guidance.

6.2 Resonance Analysis

Shunt capacitors form a parallel resonant circuit with system inductance. If a resonant frequency coincides with a significant harmonic frequency (typically the 5th or 7th for six-pulse drives), harmonic voltages and currents can be amplified to damaging levels throughout the network. A frequency scan or harmonic load flow study should be performed before installing significant capacitor banks in systems with non-linear loads.

6.3 Switched Reactive Compensation

This tool assumes fixed, continuously connected compensation. For installations where load varies significantly over the operating day, automatically switched units that disconnect reactive power steps at light load are typically required to avoid over-correction and leading power factor. Leading power factor at light load can cause voltage rise at the point of supply, affecting other equipment connected to the same bus.

6.4 Single-Phase Loads

Only three-phase inductive loads are supported. Single-phase load power factor correction requires a different approach, typically involving single-phase capacitors applied to individual circuits.

6.5 Self-Excitation

Capacitors connected at or near motor terminals can sustain self-excitation voltage after the motor disconnects from the supply, creating a hazard for personnel and equipment. For engineering guidance on maximum permissible ratings to avoid this condition, see §4.4 (Motor Terminal). This tool does not enforce or check these limits.

6.6 Protection Coordination

Capacitor banks alter fault current magnitude and distribution. Their addition may require revision of fuse ratings, relay settings, and circuit breaker interrupting ratings. Review by a protection engineer is required for significant installations, particularly where banks are connected to medium-voltage systems.

6.7 Voltage Regulation

Large fixed reactive compensation units can cause unacceptable voltage rise at the point of connection under light load conditions, potentially exceeding statutory voltage limits. A power flow study should confirm that voltage remains within acceptable limits across the full range of operating conditions before proceeding with installation.

7. Worked Examples

7.1 Example 1 — Small Industrial Feeder (415 V, Two Loads)

A small industrial plant has two three-phase inductive loads fed from a 415 V distribution board. The utility applies a demand charge of $14.00/kVA/month over 12 billing months. The plant operates 3,600 hours per year at $0.12/kWh. The target power factor is 0.95.

# Load Qty Power Rating Power Factor Duty Location
1 Air Compressor 1 55 kVA 0.72 85% Motor Terminal
2 Chiller Unit 1 90 kVA 0.78 100% Local Distribution Board

First establish tan φ₂ for the target PF of 0.95:

tan φ₂ = √(1 − 0.95²) / 0.95 = 0.3123 / 0.95 = 0.3287

Load 1 — Air Compressor

kVAeff = 55 × 0.85 = 46.75 kVA
P = 46.75 × 0.72 = 33.66 kW
kVAR = 46.75 × √(1 − 0.72²) = 46.75 × 0.6940 = 32.44 kVAR
tan φ₁ = 0.6940 / 0.72 = 0.9639
Qc = 33.66 × (0.9639 − 0.3287) = 33.66 × 0.6352 = 21.38 kVAR
Standard kVAR (rounded up): 25 kVAR (next step above 21.38)
kVARafter = max(32.44 − 25, 0) = 7.44 kVAR
kVAafter = √(33.66² + 7.44²) = 34.47 kVA
PFcorrected = 33.66 / 34.47 = 0.977

Load 2 — Chiller Unit

kVAeff = 90 × 1.00 = 90.00 kVA
P = 90 × 0.78 = 70.20 kW
kVAR = 90 × √(1 − 0.78²) = 90 × 0.6258 = 56.32 kVAR
tan φ₁ = 0.6258 / 0.78 = 0.8023
Qc = 70.20 × (0.8023 − 0.3287) = 70.20 × 0.4736 = 33.25 kVAR
Standard kVAR (rounded up): 40 kVAR (next step above 33.25)
kVARafter = max(56.32 − 40, 0) = 16.32 kVAR
kVAafter = √(70.20² + 16.32²) = 72.07 kVA
PFcorrected = 70.20 / 72.07 = 0.974

System Summary

Parameter Value
Total Active Power 103.9 kW
Total kVAR (existing) 88.8 kVAR
Total kVA (existing) 136.6 kVA
Computed System PF (existing) 0.760
Total Qc Required 54.6 kVAR
Total Qc Rounded (installed) 65.0 kVAR (25 + 40)
System kVA After Correction 106.5 kVA
Corrected System PF 0.976
kVA Demand Reduction 30.1 kVA
Est. Annual Demand Savings ≈ $5,060 /yr

If a reactive power cost of $35/kVAR is entered, the cost estimate outputs would be:

Parameter Value
Total Est. Reactive Power Cost $2,275 (65 kVAR × $35)
Avg. Cost per Active Load $1,138 (2 loads)
Simple System Payback ≈ 0.4 yr
Est. Cost — Motor Terminal $875 (25 kVAR)
Est. Cost — Local Distribution Board $1,400 (40 kVAR)

7.2 Example 2 — Motor Control Centre (3.3 kV, Four Loads)

A motor control centre feeds four three-phase induction motors at 3.3 kV. The utility charges $10.00/kVA/month over 12 billing months. Annual operating hours are 6,000 at $0.09/kWh. Target power factor is 0.95. All correction is applied at the Central Bus.

# Load Qty Power Rating Power Factor Duty
1 Pump Motor A 1 200 kVA 0.80 100%
2 Pump Motor B 1 200 kVA 0.80 75%
3 Fan Motor 1 150 kVA 0.76 100%
4 Conveyor Motor 1 75 kVA 0.82 60%

Applying Qc = P × (tan φ₁ − tan φ₂) for each load, with tan φ₂ = 0.3287 (target PF 0.95):

Load Eff. kVA P (kW) kVAR tan φ₁ Qc (kVAR) Qc Rounded (kVAR) Corrected PF
Pump Motor A 200.0 160.0 120.0 0.750 67.4 75 kVAR 0.963
Pump Motor B 150.0 120.0 90.0 0.750 50.6 60 kVAR 0.970
Fan Motor 150.0 114.0 97.5 0.855 60.0 75 kVAR 0.981
Conveyor Motor 45.0 36.9 25.8 0.698 13.6 15 kVAR 0.960

System Summary

Parameter Value
Total Active Power 430.9 kW
Total kVAR (existing) 333.2 kVAR
Total kVA (existing) 544.7 kVA
Computed System PF (existing) 0.791
Total Qc Required 191.6 kVAR
Total Qc Rounded (installed) 225.0 kVAR (75 + 60 + 75 + 15)
System kVA After Correction 444.3 kVA
Corrected System PF 0.970
kVA Demand Reduction 100.4 kVA
Est. Annual Demand Savings ≈ $12,053 /yr

Pump Motor B runs at 75% duty, reducing its effective kVA to 150 kVA and its Qc requirement proportionally. The calculated Qc of 50.6 kVAR exceeds the 50 kVAR standard step, so it rounds up to 60 kVAR, achieving a corrected PF of 0.970. This illustrates a general feature of the rounding logic: stepping up to the next available size produces corrected power factors that are typically somewhat above the specified target, with the margin depending on how far Qc falls from the next step boundary.

8. References

  1. IEEE Std 18-2012, IEEE Standard for Shunt Power Capacitors
  2. IEEE Std 1036-2020, IEEE Guide for the Application of Shunt Power Capacitors
  3. IEEE Std 141-1993, IEEE Recommended Practice for Electric Power Distribution for Industrial Plants (Red Book) — Chapter 8: Power Factor and Related Considerations
  4. IEEE C57.110-2018, IEEE Recommended Practice for Establishing Liquid-Immersed and Dry-Type Power and Distribution Transformer Capability When Supplying Nonsinusoidal Load Currents
  5. IEC 60831-1:2014, Shunt power capacitors of the self-healing type for a.c. systems — Part 1: General — Performance, testing and rating — Safety requirements — Guide for installation and operation