Panel Pro is a panel schedule calculator that sizes low-voltage distribution panelboards and switchgear from user-entered building load data. The tool outputs the minimum recommended busbar rating, branch-circuit breaker counts by pole, phase-load balance, panel space requirements, and feeder ampacity. All calculations are governed by NFPA 70-2026 (NEC 2026), primarily Articles 120, 210, 215, 408, and 430. IEEE 3001.2, IEEE 3004.5-2025, and IEEE C37.20.1 are referenced for load-flow methodology, breaker application, and switchgear ratings respectively.

The tool covers the full busbar rating ladder from 60 A residential load centres through 4000 A metal-enclosed switchgear, with advisory flags triggered at the 600 A and 800 A boundaries where the applicable standards change.

2. Governing Standards

Standard Edition Role
NFPA 70 — NEC Articles 120, 210, 215, 408, 430 2026 Primary code authority for load calculation, demand factors, branch-circuit and feeder sizing, panelboard ratings
IEEE 3001.2 2022 Load-flow methodology for commercial and industrial power systems
IEEE 3004.5 2025 Low-voltage circuit breaker application — informs breaker selection advisory outputs
IEEE C37.20.1 2022 Metal-enclosed LV switchgear — standard busbar ratings ≥ 800 A; triggers mandatory advisory
UL 67 Current Panelboard standard for residential load centres (≤ 225 A)
UL 489 Current MCCB-based distribution panelboards

3. Input Parameters

3.1 System Configuration

Parameter Range / Default Description
Voltage System — Sets VLN and VLL and the phase configuration (1Ø 2-wire, 1Ø 3-wire split-phase, 3Ø 4-wire wye, 3Ø 3-wire delta). All demand-current and branch-circuit-current formulae select the correct divisor from this selection.
System Power Factor (PF) 0.70–1.00; default 0.90 Default applied to all load groups unless overridden per group.
Spare Capacity (%) 0–40%; default 20% Percentage reserved above calculated demand for future loads. Applied in the design demand calculation.
Growth Factor (%) default 0% Anticipated future load growth expressed as a percentage of total demand. Applied multiplicatively before the spare capacity divisor.

3.2 Load Groups

Each row in the load table represents one load group. The fields are:

Field Description
Description User label (e.g., "General Lighting").
Load Type LIGHTING, RECEPTACLE, MOTOR, HVAC, APPLIANCE, EV_CHARGER, or CUSTOM. Selects the NEC demand factor schedule automatically.
Quantity Number of identical circuits or devices in this group.
VA / Unit Connected load per circuit or device in volt-amperes.
Power Factor Per-group power factor override; if left at the system default it inherits the system PF.
Demand Factor Demand factor override (0.01–1.00). Leave blank to apply the NEC 2026 tabulated value automatically.
Continuous YES if the load operates for 3 hours or more continuously. Triggers the §210.19 ×1.25 multiplier for branch-circuit and breaker sizing (not applied to busbar demand current).
Phase Explicit phase assignment (A, B, C, AB, BC, CA, ABC) or AUTO. AUTO uses the automatic phase-balancing method described in §5.5.

4. NEC 2026 Demand Factor Application

Demand factors reduce the connected load to reflect that not all circuits operate simultaneously at full nameplate rating. The tool applies the following NEC 2026 schedules automatically when DF is left blank:

Load Type NEC 2026 Reference Demand Factor Rule
LIGHTING §120.12 / Table 120.12 100% (general); warehouse and specific occupancies reduced per table
RECEPTACLE §120.44 / Table 120.44 First 10 000 VA @ 100%; remainder @ 50%
MOTOR §430.24 100%; largest motor receives additional ×1.25 uplift on demand load
HVAC §430.24 / §120.82 100% on largest unit; non-coincident loads at 0% where applicable
APPLIANCE §120.19 75% (conservative; override with DF field for known diversity)
EV_CHARGER §625.42 100% first charger; subsequent chargers subject to §625.42 diversity schedule if DF override entered
CUSTOM — 100% unless DF override provided
The §430.24 motor uplift (×1.25 on the largest motor's demand load) is applied automatically when any MOTOR or HVAC load type is present. The remaining motor loads are carried at 100% demand. This is applied to the demand load for busbar sizing — it is separate from and in addition to the §210.19 continuous load ×1.25 for branch-circuit breaker sizing.

5. Calculation Stages

5.1 Connected Load

For each load group i, the connected load in volt-amperes is:

CLi = qtyi × VA/Uniti

Total connected load:

CLtotal = Σ CLi

5.2 Demand Load

The NEC 2026 demand factor for each group is applied:

DLi = CLi × DFi

For RECEPTACLE groups, the demand factor is computed using the tiered §120.44 schedule rather than a flat factor, so the effective DF varies with CLi:

DLreceptacle = min(CL, 10 000) × 1.00 + max(0, CL − 10 000) × 0.50

Total demand load:

DLtotal = Σ DLi

5.3 Design Demand and Busbar Sizing

Spare capacity and growth factor are applied to obtain the design demand:

DLdesign = DLtotal × (1 + G/100) / (1 − Sres/100)

Total demand current:

Idemand = DLdesign / (√3 × VLL) — three-phase systems
Idemand = DLdesign / VLL — single-phase (split or 2-wire)

The minimum standard busbar rating Ibus is selected as the next value in the full NEC / IEEE ladder that satisfies Ibus ≥ Idemand:

Busbar Rating (A) Governing Standard Advisory
60 – 200 NEC §408 / UL 67 (load centre) None
225 – 400 NEC §408 / UL 489 (MCCB panelboard) None
600 NEC §408 / UL 489 WARN — approach switchgear boundary; confirm short-circuit rating
800 – 4000 IEEE C37.20.1 (metal-enclosed switchgear) ALERT — short-circuit study mandatory; cross-link to Short-Circuit Lab

5.4 Branch-Circuit Breaker Sizing

For each load group, the branch-circuit current is calculated using the continuous-load-adjusted demand (DLadj = DLi × 1.25 for continuous loads; DLi otherwise):

Ibc = DLadj / (VLN × qty) — 1-pole loads
Ibc = DLadj / (VLL × qty) — 2-pole loads
Ibc = DLadj / (√3 × VLL × qty) — 3-pole loads

Ibc is rounded up to the next value in the NEC §240.6(A) standard rating schedule: 15, 20, 25, 30, 35, 40, 45, 50, 60, 70, 80, 90, 100, 110, 125, 150, 175, 200, 225, 250, 300, 350, 400, 450, 500, 600 A.

Motor loads: §430.52 governs the maximum rating of the branch-circuit short-circuit and ground-fault protective device for motor circuits. The Ibr value shown for MOTOR rows in Panel Pro is an approximation based on running demand only. Use the Motor Dashboard for full §430.52 device selection including starting current multipliers.

5.5 Phase Load Distribution

When a load group's Phase is set to AUTO, Panel Pro spreads it across the available phases automatically so that no single phase carries noticeably more than the others. An even split keeps neutral current low and avoids overloading one leg of the panel.

The rule is deliberately simple — the same way you would share several heavy bags among a group of people so everyone carries about the same weight: hand out the heaviest bag first, always to whoever is currently carrying the least, then work down to the lightest. Applied to a panel:

  1. List every single-pole (line-to-neutral) load group and sort it from largest to smallest by adjusted demand current.
  2. Take the largest remaining load and add it to whichever phase (A, B, or C) currently carries the least total current.
  3. Repeat down the list until every single-pole load has been placed.
  4. Two-pole (line-to-line) loads are then added to the phase pair with the lowest combined total, splitting the current across both legs. Three-pole (balanced) loads are divided equally across all three phases.

Worked example. Suppose five single-pole load groups draw adjusted demand currents of 30, 20, 18, 14, and 10 A on a three-phase panel. Sorted largest-first, each is placed onto the lightest phase at that moment:

Step Load placed (A) Assigned to Phase A (A) Phase B (A) Phase C (A)
Start — — 0 0 0
1 30 A 30 0 0
2 20 B 30 20 0
3 18 C 30 20 18
4 14 C 30 20 32
5 10 B 30 30 32

After the single-pole pass, the phase loading is A = 30 A, B = 30 A, C = 32 A — an average of 30.7 A against a peak of 32 A, or 4.3% imbalance. Handling the largest loads first is what lets the smaller ones fill in the gaps and even out the result. Two- and three-pole loads are then layered on top of these running totals.

Adding two-pole loads. A two-pole (line-to-line) load connects across two legs, so it is placed on the leg pair carrying the least combined current rather than on a single phase. Continuing from the totals above, suppose the first two-pole load contributes 10 A to each of its legs. The candidate pair totals are A–B = 60 A, B–C = 62 A, A–C = 62 A, so it takes the lightest pair, A–B — 10 A is added to both of those legs, giving 40 / 40 / 32. Note the comparison is between pairs, not single phases: phase C is the heaviest leg on its own at 32 A, yet A–B is still the lightest combination.

A second two-pole load of 4 A per leg is then placed against the updated totals. This time two pairs tie for lightest — B–C = 72 A and A–C = 72 A — so the tool breaks the tie with a fixed pair order, A–B → B–C → A–C, and takes the first of the tied pair, B–C. That adds 4 A to phases B and C:

Step Load placed (A per leg) Pair chosen Phase A (A) Phase B (A) Phase C (A)
Carried over — — 30 30 32
1 10 A–B 40 40 32
2 4 B–C (tie-break) 40 44 36

Adding a three-pole load. A three-pole load is balanced by definition, so there is no pair to choose — its per-phase current is added to all three legs equally. Suppose a three-pole load contributes 12 A per phase:

Step Load placed (A per phase) Applied to Phase A (A) Phase B (A) Phase C (A)
Carried over — — 40 44 36
1 12 A, B & C 52 56 48

With all loads placed, the panel sits at A = 52 A, B = 56 A, C = 48 A. The two two-pole loads had pushed the imbalance up to the 10% mark, but the balanced three-pole load pulls it back down — adding the same current to every leg raises the average without favouring any phase, so the absolute spread between legs is unchanged while the imbalance ratio shrinks.

Phase imbalance is computed as:

Imbal% = (max(SA, SB, SC) − Iavg) / Iavg × 100

For the final loading, that is (56 − 52) / 52 × 100 = 7.7% — still within the 10% threshold. A WARN advisory is issued when Imbal% exceeds 10%. Load groups given an explicit phase (A, B, C, AB, BC, CA, ABC) skip the automatic step and are added straight to the phases the engineer selected.

5.6 Panel Spaces

Panel spaces consumed are:

Spacesused = N1P × 1 + N2P × 2 + N3P × 3

Accounting for the same spare capacity percentage:

Spacesfull = ⌈ Spacesused / (1 − Sres/100) ⌉

Rounded up to the next standard panel space count: 12, 16, 20, 24, 30, 42, 54, 84 spaces.

NEC §408.36 permits the sum of branch-circuit breaker ratings to exceed the main busbar rating. This is by design — demand factors and diversity prevent all circuits from operating simultaneously at full rating. Panel Pro does not flag this condition as an error.

5.7 Feeder Ampacity

The required feeder conductor ampacity per NEC §215.2(A)(1) must be not less than the maximum load to be served. Panel Pro outputs:

Ifeeder = max(Idemand, 0.80 × Ibus)

The 0.80 × Ibus floor ensures the feeder is sized for the full panel capacity where demand is low relative to the selected busbar. For conductor sizing, cross-reference the Conductor Spec tool using Ifeeder as the design current input.

6. Advisory Flag System

Panel Pro generates three levels of advisory after each calculation:

Level Meaning Example Triggers
INFO Informational notes requiring no action. Motor loads detected; growth factor applied.
WARN Conditions requiring engineering review before finalising the design. Phase imbalance > 10%; panel loading > 80% of busbar.
ALERT Conditions that must be resolved before proceeding. Demand > 4000 A; metal-enclosed switchgear required.

7. Occupancy Load Presets

Four occupancy preset buttons pre-populate the load table with representative load groups using load densities consistent with NEC 2026 Article 120 and IEEE 3001.2. These are starting-point estimates only — the engineer must replace preset values with actual nameplate data for a code-compliant design.

Preset Default Loads Included Primary NEC Reference
Residential General lighting, small-appliance circuits, laundry circuit, HVAC §120.82 / §120.52
Office Lighting, receptacle circuits, HVAC, office equipment §120.44 / §120.12
Retail Lighting, receptacles, HVAC, display/sign loads §120.12
Industrial Lighting, receptacles, two motor loads §430.24 / §120.44

8. Inter-Tool Integration

Panel Pro is designed as an upstream design step that feeds into other kVA Tools modules:

Tool Panel Pro Input Used Purpose
Conductor Spec Ifeeder Design current input for feeder conductor sizing per NEC Article 310.
Motor Dashboard Motor group data Full NEC Article 430 analysis including FLA, LRA, overload protection, and branch-circuit device sizing per Table 430.52.
Breaker Wizard (IEEE 3004.5-2025) Ibus and available fault current Main breaker selection and interrupting rating verification.
Short-Circuit Lab (IEC 60909-0) Ibus Determines available fault current for switchgear withstand rating per IEEE C37.20.1; mandatory when Ibus ≥ 600 A.

9. Known Limitations

  • Harmonic derating (IEEE 519-2022) for non-linear loads is not computed. An INFO advisory is issued when motor or HVAC loads are present suggesting harmonic review.
  • Sub-panel and multi-panel configurations are not modelled. Each Panel Pro instance represents a single panelboard or switchgear assembly.
  • Voltage drop on branch circuits and feeders is not calculated here — cross-reference the Voltage Drop Calculator.
  • The optional calculation method for dwellings (former NEC §220.82, renumbered in NEC 2026) is not implemented in v1.0.
  • IEC 60364 jurisdictions: use the Cable Scout for IEC-based sizing; this tool applies NEC 2026 exclusively.

10. References

  1. NFPA 70-2026, National Electrical Code (NEC), Articles 120, 210, 215, 408, and 430
  2. IEEE Std 3001.2-2022, Recommended Practice for Evaluating the Electrical Service Requirements of Industrial and Commercial Power Systems
  3. IEEE Std 3004.5-2025, Recommended Practice for the Application of Low-Voltage Circuit Breakers in Industrial and Commercial Power Systems
  4. IEEE Std C37.20.1-2022, Standard for Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear